RECONFIGURATION OR SUBDIVISION SURVEYS

Home – Services Detail

Our Services

RECONFIGURATION OR SUBDIVISION SURVEYS

In Queensland, Australia, a Reconfiguration of a Lot refers to the process of altering existing property boundaries or creating new lots by subdividing, amalgamating, or rearranging land parcels. This process is governed by the Planning Act 2016 and administered by the local government authorities or the Queensland Department of Resources (DoR).

The reconfiguration of a lot can involve various changes to land parcels, such as:

Subdivision

Dividing a larger land parcel into two or more smaller lots. This can be a simple subdivision creating a couple of new lots or a more complex development involving multiple new lots and infrastructure considerations.

Amalgamation

Combining multiple smaller lots into a larger single lot.

Rearrangement

Adjusting the boundaries of existing lots without necessarily creating new lots.

The process of reconfiguring a lot typically involves several steps:

Preparation and Planning

This phase involves engaging a registered cadastral surveyor and possibly other professionals, such as town planners or engineers, to assess the feasibility and plan the proposed reconfiguration. This step includes preparing a proposed plan of survey detailing the changes.

Application Submission

Once the plan is ready, an application is submitted to the local council or the DoR, depending on the scale and nature of the reconfiguration. The application includes necessary documents, such as the proposed survey plan, supporting reports, and application forms.

Assessment and Approval

The local council or the DoR assesses the application against relevant planning schemes, zoning regulations, infrastructure requirements, and other applicable laws. If the proposal meets all requirements and is deemed acceptable, approval is granted.

Survey and Plan Lodgment

After approval, the registered cadastral surveyor conducts the necessary survey work to create or modify the lots as proposed. A final survey plan is prepared, lodged, and registered with the Titles Registry Office.

Infrastructure and Compliance

Depending on the reconfiguration, developers might need to provide infrastructure like roads, drainage, utilities, etc., as per the conditions set by the authorities. Compliance with these conditions is essential before the new lots can be formally created or titles issued.

Reconfiguring a lot in Queensland involves a comprehensive process and adherence to specific guidelines and regulations to ensure that the changes align with planning policies, land use requirements, and infrastructure provisions.

It’s crucial to engage experienced professionals such as surveyors, town planners, and legal advisors familiar with Queensland’s land development regulations to navigate the complexities of lot reconfiguration successfully.